Jump to content
Email-only Log-Ins Coming in December ×

Mike's Blog

  • entries
    6
  • comments
    5
  • views
    37,334

Old Journal Entry


Mike

1,291 views

This is an entry from my old journal before turning off that module.

My Z

Created this as a backup to my for sale ad, removed when I finished the project.

The bad thing about having a "new" restoration like this is the old parts. It's soo hard to put an old part next to a new part. While I have all of the old stuff around, there are things that you'll want to replace with new or rebuilt. The two engines should be rebuilt. While I took out the operational L24 and set it aside, it was nearly 10 years ago. The L28 head is off and I pulled it apart in preparation for rebuild. The lower half is fine, but, it's a question of "should I rebuild the whole thing while I have it this far??" kind of thing...

The drive train is all there. I'd replace the U-joints and the fluids in the tranny and diff. The backside of the car is completely new suspension, cross arms, bushings, etc.

The interior parts are all there (two sets of seats, new dash, all wiring, guages, and vinyl coverings. I suggest replacing the vinyl coverings with new ones. I don't have the carpet anymore, so, that will need to be replaced. I do have all of the plastics. There may be a piece here and there you'll want to replace due to cracking. Or, I'd just get new plastics. The plastic is something you can also do anytime and the existing stuff isn't in THAT bad of shape.

I have all the glass except for the front windshield. The existing door glass was cleaned up extensively and I have all of the door hardware including many new pieces from MSA or Classic Datsun.

I'm throwing in the EFI system (no tank though) and the side-draft SU's. I will be selling my triple Mikuni's separately.

Here's another update:

I was actually looking over the car this afternoon and can say that only emblems holes

that were filled are on the hatch. The holes on the side of the fenders are ready for

emblems! Just thought I'd give you my observation.

The front end of the car still needs to be painted and finished (headlight buckets and

bottom valance). I held off on this because my existing buckets were plastic and the bolts

rusted and broke when I disassembled the car. I've been holding out for the plastic headlight

buckets, but, managed to pick up a set of metal ones. I do have the original plastic units

and they could be re-tapped and used again (for someone with patience). I was also trying

to decide if I should go with an original g-nose kit or not. I do have some contacts in China

and this kit can be sent to me for around $1,500. My other consideration was a replacement

valance from an aftermarket company but I never found something I could live with. Anyway,

point is......... some work will need to be done to complete the front.

I have paid in advance for the front paint work at a local shop and they simply need the parts

to complete the paint and assembly. It's been about 3-4 years since they did the work I will

need to make sure they still remember the 'deal.' Fortunately I know the owner so it won't be

that big of a deal.

The engines I have here are not stock and the numbers don't match. One of them is a L24 and

the other is an L28. I was thinking about doing the ATK engine exchange for the L28. I do

have two E88 heads. I also have 6-1 headers.

Here's a "to-do list" of things I compiled over the years:

Bodywork:

- Headlight buckets (replace?)

- Front valance

- Rear light surrounds

- Wiper motor & arms (need to clean up)

- Bumpers

- 1/4 Windows

- Door Windows

- Front glass (need to buy)

- Rear glass (replace?)

Lights:

- New headlight assemblies (need to purchase)

- Marker lights (clean up)

- Rear tail lights (clean up or replace with euro)

- Front flashers (clean up)

Engine Compartment:

- Wiring harness (clean up)

- Fluid tubing (install one return-vent tube - have this already)

- Hood latch (may want a new one)

Suspension:

- Front swaybar (new one already purchased from MSA)

- Rear swaybar (new one already purchased from MSA)

Interior:

- Dash (install guages and new dash from Les)

- Dash wiring harness (clean up and install)

- Rear wiring harness (clean up and install)

- Seats (two sets - one vinyl, one custom interior)

- Sound deadener (done, may want more in back)

- Carpet (need to purchase a kit)

- Vinyl trim (replace with new is best)

- Plastic trim (clean up or replace)

- Headliner (need to purchase)

- Door assemblies (need to clean up and install)

- Hatch assembly (need to clean up and install)

- Firewall insulation (need to buy from Nissan)

Drivetrain:

- Engine (need to rebuild)

- Differential (change fluids and install)

- Transmission (change fluids and install - May want 5-speed?)

- Rear drums (possibly convert to calipers)

- Front calipers (want to convert to Toyota)

- Flush all hydraulic lines

Clutch System:

- Slave cylinder examine (was new in 98)

- Drain and flush

To do:

- Order sound deadener & install (done)

- Order dash or cap (done)

- Order door seals (done, but, may want newer updated versions)

- Order window seals (done, but, may want newer updated versions)

- Obtain new wiring harness or clean up old one

- Disassemble old dash

- Reassemble new dash

- Order rear tail-light seals

- Install heater and controls

- Install wiring

- Order and install vinyl kit

- Order and install carpet kit

- Order rebuilt engine

To be continued...............

0 Comments


Recommended Comments

There are no comments to display.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


  • Blog Statistics

    • Total Blogs
      167
    • Total Entries
      251
  • Blog Comments

    • I'm still waiting on a hoist to free up before I can start bolting the new brake parts on my Z, but I did make the drill jig today.  I started with a 12mm thick Mustang wheel spacer with a pilot.  I then made a drawing to layout the holes needed.  I transfered the drawing onto the spacer and I drilled three new 1/8" holes through the jig (spacer) so I'd have the correct 4x114.3mm holes.  One hole is shared from the original 5 lug rotor.  I then bolted the jig onto the Mustang rotor and simply dr
    • Local radiator repair shops used to be plentiful but getting harder to find.  Some of them just specialize in big truck-heavy equipment radiators.  I will be needing to do the same for my project.  I have heard good reports on gas tank RENU but there are none of those franchises in my area.  Good luck, John-Lugoff, SC
    • Decided to go with the 240sx conversion. Main reason is it’s strictly for the street and the parts were easy to source. What I didn’t realize was the 14” wheels won’t clear the caliper. Now looking for a set of 4 lug 15” rims and tires I can use during the build process. Can anyone recommend a temporary solution as far as make and model preferably a steel wheel that I can use until I’m ready to buy the wheel and tire combination at the end of the project? Thanks again for all the help out there.
    • There are several reasons to use the S197 rear brakes.  The rotors are larger diameter than the SVO rotors and they are vented.  The calipers have larger pistons to give them more power.  The big beef with the Maxima rears is that they don't offer as much stopping power as the stock drums.  The S197 rears allow the addition of an adjustable proportioning valve.  The Maxima rears cannot utilize an adjustable prop since the prop needs to be all the way open to get close to enough rear bias. 
    • Any particular reason to use S197 Mustang 5-lug brakes?  The Fox body SVO Mustangs had rear discs with 4-lug.  It's a popular swap to use SVO or T-bird Turbo Coupe rear brakes to retrofit discs to other Fox body Mustangs.  These parts are still pretty common (probably available as a kit).  Might be worth checking to see if they'll fit.
×
×
  • Create New...

Important Information

By using this site, you agree to our Privacy Policy and Guidelines. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.