Posted May 19, 201113 yr comment_356196 Formed and ran lines:- 1/4" fuel return- 5/16" fuel send- 3/16" fuel vaporRefurbished fuel line clips- wire brushed using drill- drilled out and tapped broken bolts- oshpho dip- paintContinued Rebuilding front hubs- Brembo rotors installed- Wheel bearing tension set and cotter pins installed- Tension/Compression rod ball and socket installedRemoved over-spray on aluminum s/n platesRefurbished and installed brake pressure switchRefurbished Hand Brake assemblyPicked up foil backed bubble wrap and adhesive for sound insulation and thermal insulationWhew... even more to do tomorrow. Lots of fun. Link to comment https://www.classiczcars.com/forums/topic/39616-more-lines-and-more/ Share on other sites More sharing options...
May 19, 201113 yr comment_356238 Yeeeee HAW! Sounds like a fun rewarding day! I can't wait to start digging in on my Z but there is so much prep work to do.. Link to comment https://www.classiczcars.com/forums/topic/39616-more-lines-and-more/#findComment-356238 Share on other sites More sharing options...
Create an account or sign in to comment